Mission Breakdown
A production goal becomes tasks for specific machines.

CATFISH OS / MISSION CONTROL
Orchestrate Production
Give the system a production goal. Mission Control assigns the work across every available robot.
WHAT IT DOES
"Complete panel P-471 by 4 PM", not "run program 187". Mission Control breaks the goal into tasks and sends each one to the right machine.
USED BY · PRODUCTION SUPERVISORS AND PLANNERS
CAPABILITIES
Mission Control scheduling depends on the machines, resources and plant data connected at the site.
A production goal becomes tasks for specific machines.
Due dates, dependencies, WPS, capability, material, labor, crane and floor space.
Work moves when a robot stops or material is late, with the reason logged.
People can overrule any scheduling decision.
Material demand, shortages and procurement linked to production.
CONNECTIONS
Mission Control assigns work using production state from Fleet and execution through Control X.
WORKFLOW
Set the production mission.
Split it into machine tasks.
Send each task to the right robot.
Reassign when conditions change.
Mark the mission complete in Proof.
RELATED HARDWARE
TALK TO US
Share a part drawing and the production constraint you want Mission Control to address.